Task object (audit step template)

Attributes included into the data transfer

ARIS attribute

ARCM attribute (deviating)

M*

Notes

Name

X

Description/Definition

Start date

Audit step period (plan)

X

Planned start date of the audit step.

Maximum total time

Audit step period (plan)

X

The maximum total time of any related audit step template must not exceed the end date of the project in the audit template.

Weekend off

If the Weekend off option was selected the max. total time is extended by two days when the time period contains a weekend.

Desired processing time

Processing time (plan)

X

Duration planned for the execution of the audit step.

Audit step type

Determines the task type of an audit step:

  • Logistic task

  • Point of audit task

Title (1‑4)

Indicates the titles of linked documents.

Link (1‑4)

Indicates the links of linked documents.

ARIS document storage Title (1‑4)

Indicates the titles of linked documents in ARIS document storage.

ARIS document storage link (1‑4)

Indicates the links of linked documents in ARIS document storage.

*The M column specifies whether the attribute is a mandatory field.